Steel / Pipes
Steel / Pipes
-
Special Tool Box Spaecial tool box that keep the various type of tools in a narrow space. Custom order is available
3.0MW-0.9ML-2.4MH
Aug, 2013 and 10 Units
Doosan Heavy Industry
1 : 0.18/1 : 0.21
-
Working stand for the LP-Casing assembly To ensure the safety when assembling the products of the large and heavy. By applying Slide scaffold, take advantage of the inner space regardless of the shape of the product.
12.0MW-15ML-3.8MH
May, 2013 and 3 Units
Doosan Heavy Industry
1 : 0.18/1 : 0.21
-
Container for transper of the Turbin Rotor Product that to protect the turnine rotor when transporting overseas
5MW-15ML-5.5MH, Working Load 250ton
May, 2013 and 20 Units
Doosan Heavy Industry
1 : 0.08/1 : 0.08
-
Stand for the comp disk assembly Because to assemble vertically for assembly of the turbin comp time disk. Equipment that to reduce the time and accomplish the convenience of work which is to achieve lift-integrated type in which safe work and the height can be adjusted.
12MW-12ML-25MH, Working Load 2ton
Jun, 2013
Doosan Heavy Industry
1 : 0.36/1 : 0.42
-
Welding Station Integrated workshop that created a room for a stable welding including a turning roller and other equipment in the room
8MW-15ML-5.0MH, Working Load 50ton
Mar, 2015
Doosan Heavy Industry
1 : 0.4/1 : 0.5
-
Welding Station Integrated workshop that created a room for a stable welding including a turning roller and other equipment in the room
8MW-15ML-5.0MH, Working Load 50ton
Mar, 2015
Doosan Heavy Industry
1 : 0.4/1 : 0.5
-
Welding Station Integrated workshop that created a room for a stable welding including a turning roller and other equipment in the room
8MW-15ML-5.0MH, Working Load 50ton
Mar, 2015
Doosan Heavy Industry
1 : 0.4/1 : 0.5
-
Template Jig to setting the position of the anchor for install the generator precisely
4MW-4ML-5.0MH
Mar, 2015
Doosan Heavy Industry
1 : 0.4/1 : 0.38
-
Working Stand
Doosan Heavy Industry
1 : 0.14/1 : 0.13
-
lifting beam Customized auxiliary equipment for safe handling of heavy goods
0.6MW-12ML-1.5MH, Working Load 250ton
Mar, 2012 and 5 units
Doosan Heavy Industry
1 : 0.18/1 : 0.21
-
No Title
1 : 0.75/1 : 0.71
-
LOAD BEAM Loading platform that stored the heavy goods for a long period.
1.2MW-8.0ML-1.8MH (150TON, 75TON, 45TON)
Jun, 2013 and many others
Doosan Heavy Industry
1 : 0.7/1 : 0.67
-
Storage warehouses of heavy & large goods Storage rack that stored the heavy and large goods for a long period.
2.5MW-20ML-5.5MH (Working Load 5TON per floor)
Sep, 2012
Doosan Heavy Industry
1 : 0.36/1 : 0.42)